Effects of Unreliable Automation in Scheduling Operator Attention for Multi-Robot Control - Robotics Institute Carnegie Mellon University

Effects of Unreliable Automation in Scheduling Operator Attention for Multi-Robot Control

Shih-Yi Chien, Michael Lewis, Siddharth Mehrotra, and Katia Sycara
Conference Paper, Proceedings of IEEE International Conference on Systems, Man, and Cybernetics (SMC '12), pp. 321 - 326, October, 2012

Abstract

The present study investigates the effect of imperfect automation in a human multi-robot controlled environment with different principles for scheduling an operator's attention in a foraging task. The experiment compared a SJF-queue (shortest job first) presenting a single alarm at a time with an Open-queue which showed all current alarms. Two levels of automation reliability, high (90%) and low (50%), were examined in the study. Performance for the queue mechanisms was equivalent confirming that operator attention can be effectively directed to improve performance. Additionally, the higher reliability condition raised an operator's success rate for resolving robot failures and assisted the operator in allocating attention to emergent events in a timely manner. Although the more frequent alerts contributed to better performance operators experienced increased levels of workload.

BibTeX

@conference{Chien-2012-120865,
author = {Shih-Yi Chien and Michael Lewis and Siddharth Mehrotra and Katia Sycara},
title = {Effects of Unreliable Automation in Scheduling Operator Attention for Multi-Robot Control},
booktitle = {Proceedings of IEEE International Conference on Systems, Man, and Cybernetics (SMC '12)},
year = {2012},
month = {October},
pages = {321 - 326},
}